get_interconnection_queue3 servers reported a tool by this name when we called them. Names are chosen by whoever wrote the server, so two tools sharing a name do not have to do the same thing. We record what was reported, not what it does.
| server | result when we called it | tools |
|---|---|---|
| DC Hub Intelligence
https://dchub.cloud/mcp/officialregistry |
answers-mcp | 83 |
| DC Hub Intelligence
https://dchub.cloud/mcp |
answers-mcp | 83 |
| DC Hub Intelligence
https://dchub.cloud/mcp/registry |
answers-mcp | 83 |
3 of these answered an MCP handshake on the day we checked. That is not a promise the tool works, only that the server was running and told us the tool existed.